Redline Roof ProsFree roof inspections for Whittier homeowners.Join the list

Guide

What to do, and when

Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.

Guide7 sections1 min readWhittier, CA

Get it looked at

Three questions, and up to three Whittier contractors. Free either way.

Free · No obligation

Join the Whittier list

No company gets your details until you say yes to it by name.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, and no obligation to anyone.

Look in the attic after heavy weather

The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.

Clear the gutters before the wet season

Blocked gutters back water up under the bottom course of shingles and rot the fascia behind them. This is the highest-value hour of maintenance there is, and here it wants doing before November through March.

Cut back anything touching the roof

Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.

Keep the penetrations honest

Pipe boots crack, sealant shrinks, and satellite mounts get screwed straight through the covering. Every penetration is a hole somebody decided to make watertight, and each is worth a look.

Twice a year, from the ground

Walk the perimeter with binoculars if you have them. You are looking for missing or lifted material, dark patches, sagging lines, and anything growing where it should not be. Ten minutes, twice a year.

Deal with growth properly

Cleaning a roof aggressively does more damage than the growth was doing. Gentle treatment, patience, and a strip at the ridge to stop it returning.

In short

Put two dates in the calendar, one either side of November through March. That is the whole programme.

Related questions

I rent. Can I use this?

You can submit it, but the owner has to authorise any work, so the useful move is to get the landlord to make the request or to give you permission in writing first. Contractors will not start work for a tenant.

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

Can I stay in the house while it is done?

Most people do. Expect noise from early morning, dust in the attic, and a day where the driveway belongs to the crew.

Get the roof looked at

Free, no obligation, and your details go to no company until you say yes.